Free no obligation quote. All enquiries are welcome.
  • Get in Touch
GMT Plumbing and Heating Solutions
  • Services
  • Gallery
  • Contact
  • Request a Quote
  • Request a Quote

Gallery

🛁 Bathroom renovation 🛁 We removed the whole bath 🛁 Bathroom renovation 🛁

We removed the whole bathroom suite, renewed the chipboard flooring, chased the wall out for the concealed basin tap, dot and dabbed the walls.

Installed a Grohe wall bung toilet frame in the new stud wall. Within the stud wall we had some shelves at the end to put all the little bits and bobs. We also had a niche built to house the shower gel bottles. Installed a concealed two way shower valve.

Removed the radiator and installed it with smaller screws as they poked through into the bedroom, installed some radiator valves as was just isolation valves.

Hardiebacker board the floor, tiled the floor, tiled the walls and the windocill. Plastered the wall right of the basin, once the plaster was dried we painted it too.

Installed the bath, bath panel, wall hung vanity basin, wall hung toilet, the showers, shower screen and then the final silicone up.

The peoducts we had were a @grohe_uk wall hung toilet, @lussostone Black concealed shower, lusso black concealed basin tap, lusso wall hung vanity basin and unit. Lusso black LED mirror, Elko vein cut and cross cut tiles from @toppstilestrade, @eastbrookbathrooms beauforte bath and a black overflow bath filler tap.

The bathroom was in need of a revamp and it’s absolutely changed the room. A lot of prep work was involved and this has enabled a top final finish 🤩🔥

#grohe #lussostone #bathroomrenovation #eastbrookbathrooms #bathrooms #toppstiles
🔧 Boiler Repair 🔧 Was called for a boiler breakd 🔧 Boiler Repair 🔧 

Was called for a boiler breakdown on a Worcester 28i junior, I asked if there was any fault codes on the boiler and said the blue light was flashing.. They sent me a video and I looked in the manual..

Fast Flash - Volatile lockout..

Picked up a new fan and went to replace it, upon arriving I noticed that the boiler needed more than just a fan.. 

The bearing plate had broken off in the fan, the burner seal had disintegrated, the spark electrodes were bad, the condense trap was chocker and the heat exchanger needed a good clean out..

We done a full strip down on it, replaced the fan, installed a new bearing plate, new spark electrodes, new gasket, sweep test, flue analysis and we were back up and running..

This is why it’s important to get your boiler serviced regularly, this boiler had missed a fair few years and this resulted in a more expensive repair than was first thought. 

#boilerrepairs #boilerbreakdown #heatingengineer
🔥 System conversion 🔥 Let’s just say this Baxi h 🔥 System conversion 🔥 

Let’s just say this Baxi has a very good innings, we had to do a repair on it last year but it was time to come out. 

We removed all the pipework and cylinder in the airing cupboard, we removed the old boiler which when removed left a massive hole in the wall from the balanced flue. We blocked it up as that’s where the new flue was going to go, cored drilled new flue hole.

We picked up the hot pipe from the pantry and then cold from under the floor. Upgraded the gas to 22mm, installed some flushing points so can flush the system out, shock arrestor, system filter and scale reducer.

Now that the Worcester Greenstar 4000 was all piped up it was time to @thoroughflush the system and get that system water clean.. after this was all done we lagged the flow and returns pipework using @plumb.pal lagging tool. 

Commissioned the boiler and now the customer has a more energy efficient boiler that comes with a 8 year warranty.

Suppliers used

@plumb.pal - lagging tool
@thoroughflush
@worcesterbosch @worcesterboschprofessional 
@williams_counter_gloucester - Stock

#heatingengineer #boilers #boilerinstallation #systemconversion #worcesterboschprofessional #worcesterboschboilers
🔥 Heat only 🔥 Customers boiler was starting to fa 🔥 Heat only 🔥

Customers boiler was starting to fail and it had a really good innings.. so before it completely went they wanted to renew it.

We removed the old British Gas 330, Installed a Worcester Greenstar 18ri, Worcester system filter, installed a Hive heating and hot water programmable room stat, installed a Aquabion, flushed the system out and cleaned the really bad f&e tank out. 

The customer now has a more efficient boiler, which is protected with the system filter and they have a whole house protection with the Aquabion as they live in a hard water area place. No more limescale for them!!

All the paperwork is kept nice and tidy altogether in the personalised documents folders from @stickersandthat 

#worcesterboilers #worcesterboschprofessional #aquabion #aquabionuk #hive #heating 

@worcesterboschprofessional 
@stickersandthat 
@aquabion_uk @aquabion_group @aquabion_al
🚿 Bathroom revamp 🚿 Customer wanted to revamp the 🚿 Bathroom revamp 🚿

Customer wanted to revamp the bathroom and get rid of the bath. The bath had multiple leaks and this had caused the bath to drop with the flooring giving way. 

They wanted to get rid of the bath as they were thinking about long term and eventually struggle to get in the bath.

We removed the whole bathroom, we renewed the chipboard flooring with brand new P5 glued and screwed and was solid compared to the spongy existing.

We had the ceiling over boarded and plastered, 

New spotlights, extractor fan and a toothbrush charger installed by @deas_electrical 

We installed a 1700 x 800 shower tray, hardiebacker the floor, tiled the floor and installed a seperate toilet and  a vanity basin. 

We moved the radiator to be at the end of the shower, making sure no hideous pipework was on display. Showered boarded the walls with Wet wall shower panels. Bristan Buzz dual shower. Merlyn 8mm shower glass..

Installed new skirting boards, new mirrored cabinet and was freshly decorated by @thegirlwithabrushcheltenham 

Massive transformation and the customer is over the moon with how it’s turned out 🤩🤩
🔥 System Conversion 🔥 This job was meant to be a 🔥 System Conversion 🔥

This job was meant to be a routine boiler service, but upon doing the service we noticed it was leaking products of combustion.

I gave the customer the option of repairing the boiler or we could change the system. The boiler was 20 years old, parts were starting to break down and I explained how they could save money by converting the system to a combi as more efficient and heating up what using.

They opted for the system conversion.

We stripped out everything, including all the tanks in the loft. We had to lift the floorboards on the landing and the bedroom to get out hot and cold supplies. 

Removed redundant pipework and we removed the noisy shower pump and connected the shower feeds on to the hot and cold supplies in airing cupboard. 

We installed some flushing points in the airing cupboard so could do a @thoroughflush. We installed a dual fuel towel radiator in the airing cupboard so the customer still has that bit of heat in there summer or winter to air the clothes.

Installed a Worcester Greenstar 8000+ combi with the system filter, shock arrestor, scale reducer. Installed a Honeywell T4R programmable room stat.

We used the @plumb.pal lagging tool which I highly rate, makes lagging so much easier. 

Commissioned, demonstrated to the customer how it works and they now have a more efficient system that comes with a 10 year warranty ☺️☺️

#systemconversion #heating #plumbing #boilers #worcesterboschprofessional #worcesterboschboilers #honeywell
🔥 Boiler Relocation 🔥 The existing boiler was in 🔥 Boiler Relocation 🔥

The existing boiler was in their sons room and they wanted it out and relocated. The best location was the loft.

We removed the existing boiler and redundant pipework. Found the main runs on the landing and then ran new pipework in the cupboard and into the loft. 

Access to the gable end to install the flue collar was impossible with other structures outside, so it was time to try out the @talon.uk  flue snug. It’s easy to install and saves a lot of time!!

We’ve installed an @adey_pro system filter, two flushing points to enable a @thoroughflush on the system, a @ratechltd hotun tundish with a hotun detect, the condense was installed correctly using @condensate_pro_uk and the lagging finished with @plumb.pal lagging tool!

The customer now has their son’s room back and a properly installed boiler in the loft. 

#boiler #boilerrelocation #loftwork #heating #talon #thoroughflush #hotun #condensatepro #lagging #adey
🛀 Bathroom remodel 🛀 This bathroom was a complete 🛀 Bathroom remodel 🛀

This bathroom was a complete overhaul, we had four seperate areas knocked into one. The seperate toilet, bathroom, hallway and airing cupboard were made into one big bathroom.

Once ripped out we uncovered some issues that halted progress… the walls were just crumbling and it was going back to brickwork. We had to pull off site untill the plastering could be done and dry.

We removed the existing cast iron soil pipe and installed a new anthracite plastic one to accommodate the new position of the toilet. We ran a new basin waste to the soil pipe and ran new waste pipes on the other side of the room for the bath and showers. First fixed hot colds and heating pipes for new locations.

A lot of planning, thinking and scratching the head were done during the first fix stage.. we had to incorporate a concealed shower valve, a niche and grout lines had to line up with them all. All of that said it was worth it because the way it all works with no silly cuts, no silly grout lines is what the goal was.

The height of the room was causing us some issues with the setting of the tiles we had 2500 and the tiles were 600 wide.. four of those and we have 2400 and a silly 100mm cut.. we worked out the best way to do it where there was no silly cuts to the floor, the ceiling or the window.

As you can see from the photos it’s been a massive change to what they had. The big marble tiles, the nice floor tiles with a featured shower area and a blue backsplash… nice big vanity unit, freestanding bath and the brushed brass towel radiator. A lot of fine details have gone into the choosing of the stock and the final finish has come out greater than what the customer anticipated!..
🛁 Bathroom revamp 🛁 Removed the existing bath, ba 🛁 Bathroom revamp 🛁

Removed the existing bath, basin, toilet, electric shower and radiator. Upon removing the tired bathroom we uncovered a few issues..

The chipboard flooring was damp from previous leaks and was in serious need of being ripped up. The waste pipes were running in the wrong direction and stagnant water was just sat there..

We installed the waste pipes correctly installing a new boss connection into the soil pipe lower down. 

Chased the walls out for the shower pipes, upgraded the heating pipes to 15mm and first fixed the new towel radiator.

Once all first fixing was done we could install new chipboard flooring and tile backer the walls.

We retiled the bathroom, ply lined the floor and installed new lino. Install a J shaped bath, wall hung vanity unit, mirrored cabinet, toilet and towel radiator.

Final touches of installing the dual thermostatic shower, shelf for bottles at end of the bath, the bath panel, skirting boards and the final silicone up.

Customer is really happy and couldn’t believe it was the same room! It’s completely transformed the room!

#bathroom #bathroomrenovation #bathroomdesign #plumbing
🚿 Bathroom renovation 🚿 Customer wanted to updat 🚿 Bathroom renovation 🚿 

Customer wanted to update their bathroom and get rid of the bath and just have a shower, with doing this we slightly changed the layout of it.

Removed the bathroom suite and tiles and with doing this it took some of the walls back to brickwork… no problems too small!!.. out come the trowel and bonding and we got to work with making the walls good for the boarding.

Chased the shower pipes into the wall, we moved the heating pipes from the one wall to the other wall.

We laid the shower tray on the floor, renewed the waste pipe as it was falling the wrong way, core drilled and got it installed lower down on the external soil pipe.

Plylined the floor, installed @multipanel_it White torrazo shower boards, installed lino, installed the original toilet but renewed the toilet seat, installed a new quieter extractor fan, installed a vanity unit, cabinet mirror and a traditional radiator. 

Installed the fixed shower screen, Bristan buzz shower and because the walls were slightly bigger than the shower tray some UPVC cloaking at the end of the tray, the floor was massively out and had to put some trim on the front edge.

Siliconed up and the customer has a new bathroom, they were so pleased with the transformation they want me back next year for the main bathroom.

@multipanel_it 
@kartelluk 
@soudal_uk 
@bristan 

#bathroom #bathroomrenovation #plumbing #shower #showerboards
🔥 System Conversion 🔥 Customer wanted to change t 🔥 System Conversion 🔥

Customer wanted to change their system from a gravity fed system to combi system, with removing the hot water cylinder out of the airing cupboard frees up space for an extended bathroom (getting done next month).

We drained down the whole system, removed all redundant pipework and cylinder. Removed the incorrectly installed gas pipe and upgraded it to the correct sizes in places where was wrong.

Core drilled a new flue hole out the side wall instead of going out of the back wall, installed a new Worcester 8000+ 32KW combi, range rated down..picked up hot and colds from the downstairs cloakroom.

Upgraded the condense to @condensate_pro_uk as before it was undersized and installed incorrectly.

Flushed the system out checking the system water with @adey_pro prochecker, wired in the new @hivehomeuk and it was fine to demonstrate how the system works.

All materials supplied by @williams_counter_gloucester 

@worcesterboschprofessional 
@worcester_josh 
@talon.uk 
@hivehomeuk 
@lawtontubes 
@condensate_pro_uk 
@stickersandthat
🚽 Cloakroom 🚽 Customer wanted to renovate their c 🚽 Cloakroom 🚽

Customer wanted to renovate their cloakroom, we remove the tired suite, removed the flooring and removed all surface pipework.

We had to move the positioning of the radiator so we chased the heating pipes, the cold pipes to the toilet and the outside tap in the wall. This enabled the customer to be able to panel the walls and it to look alot tidier.

Once the customer had installed the flooring, the panelling and the wallpaper I was able to install the Vanity toilet, vanity basin and the new convector radiator.

You can see from the pictures the transformation is incredible! 🤩🦜🚽
🚿 shower fault 🚿 Customer had a brand new bathroo 🚿 shower fault 🚿

Customer had a brand new bathroom fitted (not by myself) and has said their shower has terrible flow and really dissapointed as hoped be a good shower..

The walls had been plastered painted and finished… they were worried it was a piping issue and would have to be exposed..

Along I came with my latest investment… the @salamanderpumps Aquascan.. what can I say what a cracking bit of kit..

I tested the original shower and was getting 1L/m.. I then removed the shower and tested from the fast fixing kit and getting 22l/m.. it was then we knew it isn’t a piping issue it’s a shower issue.. supplied and installed a new bar valve shower and getting 10L/m

Without the aquascan I couldn’t have tested accurately at numerous points and diagnose the exact issue! 

One happy customer that their once hoped nice shower is not just a dream!!

#plumbing #salamander #salamanderpumps #aquascan
🛁 Shower out 🛁 Customers shower door had broken 🛁 Shower out 🛁 

Customers shower door had broken and it needed replacing. The customer didn’t want a shower cubicle again and wanted their bath back as enjoy baths.

We removed the shower cubicle (and the glass shattered everywhere). Took the tiles off, took the plasterboard off the stud wall. Replaced the plasterboard, chased in the shower pipes using the Metabo wall chaser. Tided up the surface pipepwork, had to move the towel radiator from the bath area to the other side of bathroom..installed a bath and then it was shower board time.

We used the Misty Blue @multipanel_it tongue and groove boards. Re ply lined the floor, installed a @halitebathroms bath panel. Siliconed up and it was all done! 

The customer was very happy that they now have a bath instead of shower cubicle!
🔥 System conversion 🔥 The customer wanted to upgr 🔥 System conversion 🔥

The customer wanted to upgrade the system to a combi system and relocate it to the loft.

We removed the existing boiler in the kitchen and patched in the brickwork, we ran an external gas pipe up the outside with Munson rings and over the loft to the new location.

Removed the existing hot water cylinder, tanks in the loft and all redundant pipework, ran new flow return hot and colds into the loft linking in the existing shower pipework.

We cored a new flue hole and used a @talon.uk fluesnug as access wasn’t available (first time used and was very impressed).

Installed a @worcesterbosch 4000 30KW Combi boiler and a Worcester system filter, kept the original hive controls, installed two flushing points for a @thoroughflush to be done, ran the condense correctly in the loft with @condensate_pro_uk, and used @lagit_uk to help with lagging the pipework.

It definitely kept me fit up and down the ladder, customer is pleased with the airing cupboard freed up for future renovations and has a new efficient combi boiler 🔥💯

#worcesterboschprofessional #worcesterbosch #systemconversion #condensatepro #talon #lawtontubes #heatingengineer #heating #combi
🚿 Bathroom remodel 🚿 Customer wanted to remodel t 🚿 Bathroom remodel 🚿

Customer wanted to remodel the bathroom with removing the existing bath and installing a shower tray to suit their needs, install a new toilet, renew the flooring, shower board the shower area and install a vanity unit for storage.

We installed a 1700 stone resin shower tray on legs for drainage needs, altered the shower pipes to suit the new @bristan buzz2 dual thermostatic shower, @fiboukltd shower boarded the walls, installed LVT click oak flooring, installed a new vertical outlet close coupled toilet, oak vanity basin from @plumbworld, a 900 fixed shower screen with a 300 flipper panel.

Unfortunately the customers husband passed away a week prior to starting 🥲💔. You may only be in a customers house for a short period of time but you become part of their lives for your duration. We had a few hiccups along the way with supplier issues but the job has turned out more than the customer had hoped for and he’ll be looking down happy too!!

#bathroomremodel #bathroomrenovation #plumbing

No job too big or too small

Free no obligation quote. All enquiries are welcome.
Request a Quote

gmtplumbingandheating@gmail.com
07851 008878
Checkatrade
Gas Safe Logo
gmtplumbingandheating@gmail.com
07851 008878
Checkatrade
Gas Safe Logo
© 2026 GMT Plumbing and Heating Solutions. All rights reserved